Installation of Auto-Lube Systems – KCM Nchanga (Past 3 Years)

Installation of Auto-Lube Systems – KCM Nchanga (Past 3 Years)

Installation of Auto-Lube Systems – KCM Nchanga (Past 3 Years)

Installation of Auto-Lube Systems – KCM Nchanga (Past 3 Years)

  • Client:Konkola Copper Mines Plc (KCM) – Nchanga Mine
  • Category:Mining Services, Mechanical Engineering, Lubrication Systems
  • Start Date:Sep 23, 2017
  • End Date:Jul 02, 2018
  • Tag:auto-lube, lubrication-systems, kcm-nchanga, mining, lincoln, equipment-reliability, mechanical-installation
  • Budgets:Confidential

Installation of automatic lubrication (Auto-Lube) systems at KCM Nchanga Mine over a three-year period to improve equipment reliability and reduce maintenance downtime.

This project involved the installation of automatic lubrication (Auto-Lube) systems at KCM Nchanga Mine over the past three years, supporting improved equipment reliability and operational efficiency in a demanding mining environment.

Scope of Work

The scope of work included:

  • Installation of Auto-Lube systems on various mining equipment

  • Mounting of lubrication pumps, distribution lines, and injectors

  • Integration of lubrication systems with existing mechanical equipment

  • Testing, calibration, and functional verification of installed systems

  • Commissioning and handover to site maintenance teams

Technical Execution

All installations were performed by qualified technicians in accordance with manufacturer specifications and KCM engineering standards. Systems were tested under operational conditions to ensure correct lubricant flow and distribution.

Results & Benefits

  • Consistent and reliable lubrication of critical mining equipment

  • Reduced mechanical wear and unplanned breakdowns

  • Extended equipment service life

  • Improved safety by reducing manual lubrication activities

Quality, Safety & Compliance

All works were carried out in compliance with:

  • Manufacturer standards for Auto-Lube systems

  • Mining industry safety regulations

  • KCM operational and engineering requirements

The installations were completed successfully over the three-year period, meeting client performance and reliability expectations.

Gallery

quick contact: